Following Last weeks crit, it has become apparent that my previous scheme was too complicated and ambitious for my critiques to understand. For the purpose of my DR report I have chosen to simplify the scheme. By scaling down the project considerably, this beach resort can fill up different sections at high tide and purify the water until it is clean enough for visitors to swim in and relax on the beaches. The building is for the changing rooms, Thames Tideway Tunnel Information center and the overall control system. This wetland leisure centre is a prototype project that will expand and change with the tide, the building is designed to be adaptable with the ability to lift off its platform and float in the event of a flood.

Scale1-200GrdPlanl

3_Far